Collection

Company

Humen, Dongguan · Guangdong

Inside the factory.

Dongguan Mei Yue Clothing occupies a 4,600 m² floor with four production lines, nine QA/QC inspectors and twelve R&D engineers. The photographs below are taken on site, from the sample showroom to the packing area.

Mei Yue company lobby with illuminated logo
4,600
m² factory floor
4
production lines
9
QA / QC inspectors
12
R&D engineers
10+
years exporting

The building

Front of house and sample room.

Where buyers review fabrics, samples and the current range before a program starts.

The floor

Twelve steps through production.

Fabric inspection, cutting, decoration, sewing, finishing, QC and packing — photographed in sequence.

Fabric inspection
01Fabric inspection — Rolls checked for shade, weight and defects before cutting.
Automatic cutting
02Automatic cutting — Panels cut by size and colour on the cutting line.
Embroidery
03Embroidery — Multi-head embroidery for logos, patches and lettering.
Printing
04Printing — Printed artwork applied before assembly.
Sewing
05Sewing — Flat, overlock and cover-stitch assembly lines.
Pressing
06Pressing — Pressing and shaping before finishing checks.
Thread trimming
07Thread trimming — Loose threads and seam ends removed by hand.
Quality control
08Quality control — In-line and final checks by the QA/QC team.
Packing
09Packing — Folding, tagging and polybagging to the packing spec.
Finished goods
10Finished goods — Completed order staged before dispatch.
Plotter
11Plotter — Patterns and markers plotted for the cutting room.
Design studio
12Design studio — Pattern and sample development with the R&D team.

Next step

Want to audit the floor? Book a visit.

Buyers and sourcing teams are welcome in Humen. Send the dates and the product categories you want to review.

Browse the collection